Saturday, October 1, 2011

How to replace the roof and gable roof

Replace the roof gable roofs of prefabricated trusses. Costs the Timber framing than a strong, than you can create your own easy to use. Fulcrum and back to carry the rent collected old roofs and rent, or buy a special roof removal tools, shovels, serrated blades and lifting. Get tarp to cover the roof space while you work. Remove the old roof replacement installation help--, big work, or usually require at least four workers. Difficulty: ChallengingShingle toolPrybar, BUR, hammerDumpsterTarpaulinsReciprocal delete (optional) RopesFraming Plaza and pencilExtra 2 x 4-inch Board, 2 notchedFraming nailsRidge boardHurricane clips1×2 inch prop boardsOriented Strand Board ( saw OSB deckingRoofing paperConstruction staplerMetal drip edgeShingle nailsThree tab shingles caps1

Remove the old roof. Herpes Zoster is a tool to remove the gravel, lifting the serrated edge to help on the back of shingles and strips the shovel beneath the fulcrum. Collect the right dump they hopefully from the edge of the roof. Take the oriented strand board deck plywood or prybar, crowbar, hammer, wives of rafters.

2

?????? roof rafters or trusses of braces remove 2 x 4 inch boards, rafters, and fasteners to ensure while on the ground became nailed bet. Rafter wall holds and pull out the nails, and delete the other fasteners rope lift them to the ground. Rafter, reciprocal saw, cut and, alternatively delete. Get the bare wall tops under the roof.

3

Inspect the wall CAP, corruption, or other damage. Two new-of those adjacent to the wall to tie together replace the Cap 4 became transfixed on duplication, wall plates and flawed.

4

Order the truss. Flat Kagen, flat ceiling, room or other space look to add a ceiling on sourcing design vaulted room styles to choose style according to a new gabled roof truss catalog. Gets the width of the right of the truss, select the slopes to fit the needs of customers and pitch, measure the width of the wall of the House. You must get the Ridge Board slots top trusses.

5

Wall caps uses a framing rectangle marks the location of the truss. Using a thin tongue (truss plate width marks) line of the first truss. Measure and 23 - 1 / 4 inches from the wall of a square edge width blade marks the outside edge of the second truss. Internal rows and tongue, [all locations marked truss using 24 inch mark blades and tongue; may last space is 24 inches to slightly lower.

6

Install once starting from behind, is one of the trusses. Who are each side of the House 2-4 with top notch to hold the trusses in place. To unlock your upright and walk to the upside, it carries location two up on the roof of the workers. Set where its truss it by 4 2, truss, ground stakes nailed became curly braces. Using level set vertically. Framing nails wall Cap with it (the same as the nails point truss style) a claw hammer the.

7

On the opposite side of the truss roof of the second set, props, and the perpendicular to it. Set between the Ridge Board edge truss and the level to level. If one does not cover the length connects the two boards. Board 18 inches length cuts to nail 1 x 4 inches to each side of joint of single boards butted connection two ridges, and ????_???. Space each edge connects between the coverage of one truss trusses.

8

Add the marked between the trusses and other points. , And then set each one the Ridge Board to the vertically ridged substrates and wall caps. Fasten the CAP wall of Hurricane clips, trussed rafters metal brackets claws.

9

8-Inch strips to hold the deck sheet 1 x 2 inch wood vertically atop the claws of setting each truss Rafter ends. 4 An eight-foot deck panels, braces and on the edge of Flash horizontal panel truss sides and roof laying of oriented strand board ( installs the OSB. Place to provide traction during the work on the Office Shortcut bar, rough side and a roof. Using length of roof installation panel at the bottom and seams, placed, does not cover the roof peak initiates a half panel Panel of the second row. 1-2 Remove the curly braces.

10

On both sides of the roof flashing in the bottom along metal drip edges claws; run, drip edge locations in roof cement beads at the end of the office shortcut bar settings and all 18 inch roof nail was securely. Waterproof paper Strip was lying horizontally on the OSB. The secure construction stapler. Duplicate 6 inches from the seams on. Cut strip width of 12 inches, staple, peak to peak both sides doubled it. Add a drip flashing edge paper along the edge of the gable.

11

Cut the tab enough 3-tab shingles to cover the bottom of the utility knife, metal straight edges or large shears, roof. Layers of shingles down upside down nail, edge, factory edge little roof decks over under and cuts to the same height. In the first tab to start a second line does not yet have one gravel gravel seams cut. Alternative Herpes Zoster peaked roof. Cut fit shingles on the peak.

12

Cap shingles, install the peak from the current wind direction. If not capped tab provided rectangles cut shingles (features tab off cut use ). Peak over the cut pieces to hide and nails on both ends. Duplicate a CAP because it is covered in nails: plate. Seal a roof cement nails end cap.

Please read the following:

View the original article here

No comments:

Post a Comment